Rail solutions that provide ease of installation
Project key details
The lightweight Class A modular troughing system required no mechanical lifting, with each one (1) metre section rapidly assembled into position on site manually by a small crew.
All installation requirements, including excavation, assembly and backfill, were completed within hours using only standard power tools and no specialist labour or equipment.
The lightweight, sturdy and secure design of the RAILduct™ provided exclusive cabling protection for the Pakenham Rail Stabling Yards project, reinforcing RAILduct™’s versatile application in rail, power and highway projects. Additionally, the timely delivery of eight (8) larger bespoke concrete pits to the Pakenham Rail Stabling Yards project highlighted Cubis’ ability to create customised product despite the tight timeframes for delivery and project completion.
Together, Cubis was able to successfully deliver on the project requirements when customisation, timeliness and complete package supply were the top priorities. Manufacturer capacity and design improvements provided a superior pit solution. By utilising the flexibility, ease of installation and unique security features of Cubis’ RAILduct™ system, the project challenges were efficiently overcome to provide an all-round solution for the Pakenham Rail Stabling Yards project.
Challenges
Overcome shallow burying conditions, where standard burying methods could not be utilised and working within a restricted project timeline.
Solution
To provide RAILduct™ that provided superior asset protection with interlocking tamper proof covers, as well as a secure twist and locking mechanism for assembly. All installation requirements, including excavation, assembly and backfill, were completed within hours using only standard power tools and no specialist labour or equipment.